{"id":412,"date":"2016-11-02T18:07:02","date_gmt":"2016-11-02T18:07:02","guid":{"rendered":"http:\/\/ventus.global\/blog\/?p=412"},"modified":"2016-11-03T13:57:05","modified_gmt":"2016-11-03T13:57:05","slug":"santiago-mullin-los-pasos-para-la-construccion-exitosa-de-un-parque-eolico","status":"publish","type":"post","link":"https:\/\/ventus.global\/blog\/santiago-mullin-los-pasos-para-la-construccion-exitosa-de-un-parque-eolico\/","title":{"rendered":"SANTIAGO MULLIN: LOS PASOS PARA LA CONSTRUCCI\u00d3N EXITOSA DE UN PARQUE E\u00d3LICO"},"content":{"rendered":"<p><a href=\"http:\/\/ventusenergia.com\/blog\/wp-content\/uploads\/2016\/11\/nota-6.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/ventusenergia.com\/blog\/wp-content\/uploads\/2016\/11\/nota-6.jpg\" alt=\"nota-6\" width=\"592\" height=\"333\" class=\"aligncenter size-full wp-image-413\" srcset=\"https:\/\/ventus.global\/blog\/wp-content\/uploads\/2016\/11\/nota-6.jpg 592w, https:\/\/ventus.global\/blog\/wp-content\/uploads\/2016\/11\/nota-6-300x169.jpg 300w, https:\/\/ventus.global\/blog\/wp-content\/uploads\/2016\/11\/nota-6-400x225.jpg 400w\" sizes=\"auto, (max-width: 592px) 100vw, 592px\" \/><\/a><\/p>\n<p>[tp lang=\u00bbes\u00bb not_in=\u00bben\u00bb]<\/p>\n<blockquote><p>Santiago Mullin, Gerente de Ingenier\u00eda de VENTUS, empresa especializada en el desarrollo, construcci\u00f3n y operaci\u00f3n de emprendimientos de energ\u00eda e\u00f3lica analiz\u00f3 el proceso de gestaci\u00f3n y puesta en marcha de un parque, con lujo de detalle. \u00bfCu\u00e1les son los aspectos m\u00e1s importantes? El experto se explay\u00f3 en los aspectos t\u00e9cnicos, el\u00e9ctricos y comerciales, en una entrevista para energiaestrat\u00e9gica.com.<\/p><\/blockquote>\n<p>Fuente: <a href=\"http:\/\/www.energiaestrategica.com\/todos-los-pasos-la-construccion-exitosa-parque-eolico-los-secretos-tecnicos-comerciales\/\" target=\"_blank\">energ\u00edaestrat\u00e9gica.com (leer articulo completo)<\/a><br \/>\n[\/tp]<\/p>\n<p>[tp lang=\u00bben\u00bb not_in=\u00bbes\u00bb]<\/p>\n<blockquote><p>Santiago Mullin, Engineering Manager at VENTUS, a company which specializes in development, construction and operation of wind power projects, has analyzed the preparation and start-up process of a wind farm in detail. Which are the key aspects? The expert elaborated on the technical, electrical and commercial aspects in an interview for  energiaestrat\u00e9gica.com<\/p><\/blockquote>\n<p>Source: <a href=\"http:\/\/www.energiaestrategica.com\/todos-los-pasos-la-construccion-exitosa-parque-eolico-los-secretos-tecnicos-comerciales\/\" target=\"_blank\">energ\u00edaestrat\u00e9gica.com (read full story)<\/a><br \/>\n[\/tp]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[tp lang=\u00bbes\u00bb not_in=\u00bben\u00bb] Santiago Mullin, Gerente de Ingenier\u00eda de VENTUS, empresa especializada en el desarrollo, construcci\u00f3n y operaci\u00f3n de emprendimientos de energ\u00eda e\u00f3lica analiz\u00f3 el proceso de gestaci\u00f3n y puesta en marcha de un parque, con lujo de detalle. \u00bfCu\u00e1les son los aspectos m\u00e1s importantes? El experto se explay\u00f3 en los aspectos t\u00e9cnicos, el\u00e9ctricos y [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,29],"tags":[],"class_list":["post-412","post","type-post","status-publish","format-standard","hentry","category-argentina","category-entrevista"],"_links":{"self":[{"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/posts\/412","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/comments?post=412"}],"version-history":[{"count":2,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/posts\/412\/revisions"}],"predecessor-version":[{"id":440,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/posts\/412\/revisions\/440"}],"wp:attachment":[{"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/media?parent=412"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/categories?post=412"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/tags?post=412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}