{"id":1479,"date":"2018-09-11T19:45:54","date_gmt":"2018-09-11T19:45:54","guid":{"rendered":"https:\/\/ventus.global\/blog\/?p=1479"},"modified":"2018-09-12T20:01:39","modified_gmt":"2018-09-12T20:01:39","slug":"la-correcta-gestion-de-proyectos-evita-desvios-en-plazos-y-costos","status":"publish","type":"post","link":"https:\/\/ventus.global\/blog\/la-correcta-gestion-de-proyectos-evita-desvios-en-plazos-y-costos\/","title":{"rendered":"\u00abLA CORRECTA GESTI\u00d3N DE PROYECTOS EVITA DESV\u00cdOS EN PLAZOS Y COSTOS\u00bb"},"content":{"rendered":"<p>[tp lang=\u00bbes\u00bb not_in=\u00bben\u00bb]<\/p>\n<p><em>Fuente: Energ\u00eda &amp; Negocios<\/em><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-686\" src=\"https:\/\/ventusenergia.com\/blog\/wp-content\/uploads\/2017\/03\/alfredo-morelli-2-1024x784.jpg\" alt=\"\" width=\"641\" height=\"528\" \/><\/p>\n<p><em>Alfredo Morelli, Gerente de Operaciones de Ventus Argentina habla de los\u00a0 desaf\u00edos de la construcci\u00f3n de un parque e\u00f3lico, y la experiencia que la empresa tiene en la regi\u00f3n.<\/em><\/p>\n<p>Si bien los procesos de construcci\u00f3n son bastante homog\u00e9neos, existen diferencias constructivas a considerar en los parques de 10MW \u00f3 100MW, diferentes tipos de suelo, niveles de tensi\u00f3n de conexi\u00f3n, etc. Depende mucho del parque, la potencia, cantidad de aerogeneradores y el sitio donde se construya el parque.<\/p>\n<p>Lo primero que se comienza es la Ingenier\u00eda. Si bien puede considerarse un proceso tedioso, termina siendo vital para el \u00e9xito del proyecto. En particular, permite lograr mayores optimizaciones y evitar problemas en etapas finales de construcci\u00f3n y puesta en marcha. Para comenzar con la Ingenier\u00eda, es necesario tener una buena ingenier\u00eda b\u00e1sica, acordada con la utility. A su vez, estudios geot\u00e9cnicos, topograf\u00eda, hidrolog\u00eda, acceso a la capacidad de transporte y estudios de impacto ambiental son fundamentales. La ingenier\u00eda el\u00e9ctrica, particular la relacionada a las obras de conexi\u00f3n, es cr\u00edtica comenzarla cuanto antes ya que suele ser el camino cr\u00edtico del proyecto y se necesita para iniciar el proceso de compra de equipos principales.<\/p>\n<p>Hemos visto en el pasado que la mayor\u00eda de los proyectos se han preocupado, con raz\u00f3n, en asegurarse el transformador de potencia. En la pr\u00e1ctica, vemos que han sido otros suministros los cr\u00edticos.<\/p>\n<p>Una de las primeras actividades de obra, es la civil. La misma abarca diferentes especialidades como vial (caminer\u00eda, plataformas) y estructuras (cimentaciones). La extensi\u00f3n de caminos de decenas de kil\u00f3metros as\u00ed como tambi\u00e9n fundaciones de m\u00e1s de 50 camiones mixer por base, implican obras que pueden extenderse entre 4 y 12 meses, de acuerdo al tama\u00f1o y complejidad del parque.<\/p>\n<p>Algunos meses m\u00e1s tarde, a\u00fan sin finalizar la obra civil, comienza la obra el\u00e9ctrica. Cada proyecto es un mundo. La tensi\u00f3n de conexi\u00f3n, infraestructura existente, necesidad o no de apertura de l\u00ednea y utility en cuesti\u00f3n definen la complejidad del proyecto. Estas obras pueden requerir entre 6 y 18 meses.<\/p>\n<p><strong>\u00bfCu\u00e1l es el valor el servicio de gerenciamiento de proyectos y obras que realizan en Argentina?<\/strong><\/p>\n<p>La correcta gesti\u00f3n de proyectos evita desv\u00edos en plazos y costos del proyecto que podr\u00edan atentar contra el modelo econ\u00f3mico del negocio y su real concreci\u00f3n. El Gerenciamiento de Proyecto exige el m\u00e1s alto grado de planificaci\u00f3n y conocimiento de la construcci\u00f3n de este tipo de centrales generadoras. En este sentido, y producto de la vasta experiencia de la empresa, Ventus ha participado en m\u00e1s de 800 MW en Gerenciamiento de Proyectos y Obras e\u00f3licas y solares fotovoltaicos en la regi\u00f3n. Sumado a esto, la extensa experiencia de la empresa como EPCista, nos ha permitido poder brindar servicios de construcci\u00f3n a muchos clientes en el pa\u00eds.<\/p>\n<p><strong>\u00bfCu\u00e1l es la diferencia m\u00e1s importante entre un proyecto EPC y un gerenciamiento de obra?<\/strong><\/p>\n<p>Un EPC incluye la ingenier\u00eda, suministros, identificaci\u00f3n y mitigaci\u00f3n de posibles inconvenientes y construcci\u00f3n de la central. En cambio, el gerenciamiento de la obra, es s\u00f3lo una de las responsabilidades del EPCista.\u00a0 El EPCista entrega el proyecto llave en mano.<\/p>\n<p><strong>\u00bfQu\u00e9 experiencia tiene Ventus en esta modalidad de proyectos?<\/strong><\/p>\n<p>Ventus es referente en la construcci\u00f3n de proyectos de energ\u00eda renovables, tanto e\u00f3licos como solares fotovoltaicos.\u00a0 En menos de 10 a\u00f1os operando en el continente, la empresa ha construido en modalidad EPC llave en mano m\u00e1s de 25 proyectos de energ\u00edas renovables. Esta experiencia la convierte en una empresa con las cualidades apropiadas para dar soluciones eficientes y eficaces para diferentes modelos de negocio.<\/p>\n<p>[\/tp]<\/p>\n<p>[tp lang=\u00bben\u00bb not_in=\u00bbes\u00bb]<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-686\" src=\"https:\/\/ventusenergia.com\/blog\/wp-content\/uploads\/2017\/03\/alfredo-morelli-2-1024x784.jpg\" alt=\"\" width=\"860\" height=\"658\" \/><\/p>\n<p><em>Alfredo Morelli, Operations Manager at Ventus Argentina talks about the challenges of building a wind farm, and the experience that the company has in the region.<\/em><\/p>\n<p>Although the construction processes is quite homogeneous, there are constructive differences to be considered in the 10MW or 100MW wind farms, different soil types, connection voltage levels, etc. It depends a lot on the farm, the power, number of wind turbines and the place where the farm is built.<\/p>\n<p>The process begins with the Engineering. Although it can be considered a tedious process, it ends up being vital for the success of the project. In particular, it allows achieving greater optimizations and avoiding problems in the final stages of construction and commissioning. To begin with the Engineering, it is necessary to have a good basic engineering, agreed with the utility. At the same time, geotechnical studies, topography, hydrology, access to transport capacity and environmental impact studies are fundamental. Electrical engineering, particularly the one related to connection works, is critical to start as soon as possible since it is usually the critical path of the project and it is needed to start the process of purchasing major equipment.<\/p>\n<p>We have seen in the past that most projects have rightly been concerned with securing the power transformer.<\/p>\n<p>One of the first activities of work are the civil aspects. It covers different specialties such as roads (roads, platforms) and structures (foundations). The extension of roads of tens of kilometers as well as foundations of more than 50 mixer trucks per base, imply works between 4 and 12 months, according to the size and complexity of the farm.<\/p>\n<p>Some months later, even without completing the civil work, the electrical work begins. The tension of connection, existing infrastructure, need or not of opening of line and utility in question define the complexity of the project. These works may require between 6 and 18 months.<\/p>\n<p><strong>What is the value of the management service of projects and works carried out in Argentina?<\/strong><\/p>\n<p>The correct management of projects avoids deviations \u00a0of deadlines and costs of the project that could threaten the economic model of the business and its real concretion. Project Management requires the highest degree of planning and knowledge of the construction of this type of power plants. In this sense, and product of the vast experience of the company, Ventus has participated in more than 800 MW in Project Management and Wind and Solar Photovoltaic Works in the region. Added to this, the extensive experience of the company as EPC constructors, has allowed us to provide construction services to many customers in the country.<\/p>\n<p><strong>What is the most important difference between an EPC project and a construction management?<\/strong><\/p>\n<p>An EPC Project includes engineering, supplies, identification and mitigation of possible problems and construction of the plant. On the other hand, the management of the work is just one of the responsibilities of the EPC constructor. This one delivers the turnkey project.<\/p>\n<p><strong>What experience does Ventus have in this type of project?<\/strong><\/p>\n<p>Ventus has great experience in the construction of renewable energy projects, both wind and solar photovoltaic farms. In less than 10 years operating in the continent, the company has built more than 25 renewable energy projects in EPC modality. This experience makes it a company with the appropriate qualities to provide efficient and effective solutions for different business models.<\/p>\n<p>[\/tp]<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[tp lang=\u00bbes\u00bb not_in=\u00bben\u00bb] Fuente: Energ\u00eda &amp; Negocios Alfredo Morelli, Gerente de Operaciones de Ventus Argentina habla de los\u00a0 desaf\u00edos de la construcci\u00f3n de un parque e\u00f3lico, y la experiencia que la empresa tiene en la regi\u00f3n. Si bien los procesos de construcci\u00f3n son bastante homog\u00e9neos, existen diferencias constructivas a considerar en los parques de 10MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41,29,31,59,17],"tags":[],"class_list":["post-1479","post","type-post","status-publish","format-standard","hentry","category-argentina","category-entrevista","category-recurso-eolico","category-recurso-solar","category-ventus"],"_links":{"self":[{"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/posts\/1479","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/comments?post=1479"}],"version-history":[{"count":4,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/posts\/1479\/revisions"}],"predecessor-version":[{"id":1489,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/posts\/1479\/revisions\/1489"}],"wp:attachment":[{"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/media?parent=1479"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/categories?post=1479"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ventus.global\/blog\/wp-json\/wp\/v2\/tags?post=1479"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}